Spring Break Ends 2310 Email to Gilliam 2310 Introduction to the Art of Theatre through Costume Design Gilliam Leaves PM for Post Cast List & Design Postions 2310 Matchbox Production Mtg with Mr. Razavi in class to discuss ideas. Gilliam at USITT MW Rehearsals TR Rehearsals 1304/2310 7PM Read-Thru 2310 Matchbox Production Meeting to Discuss Process Matchbox Rehearsal B1 2310 Studio: Drawing the Figure & Body Shape 4 Costume Descriptions Due Matchbox MW Rehearsals TR Rehearsals Rehearsal B2 1304 Production Meeting 2310 Making Costume Choices, In-Class Drawing with Research & Character Descriptions Rehearsal & Photos A3 Rehearsal & Photos B3 2310 Design Studio ... Work on Matchbox or Costumes Matchbox MW Rehearsals TR Rehearsals Rehearsal B4 2310 Studio: Rendering the Sketch Ideas Demonstration and Practice DRESS HEDDA Matchbox Rehearsal B5 2310 Studio: Work on Fairy Tale Costumes or Matchbox Theatre Matchbox Final Poster Due HEDDA Opens Hang and Focus Plots MW Rehearsals TR Rehearsals Rehearsal B6 2310 Fairy Tale Costume Presentation Matchbox 2310 Costume Designerat Rehearsal B7 2310 Paper Tech with Director Matchbox 12:30 Matchbox Production Mtg. Matchbox 2310 Studio Time Matchbox MATCHBOX TECH REHEARSAL Hedda MATCHBOX Run Through with TECH Dress 1304 Act II in class, Act I at Night. 2310 Studio Time Matchbox MATCHBOX DRESS REHEARSAL Hedda MATCHBOX TBA MATCHBOX MATCHBOX 2310 Strike IN CLASS 1304 Course Evaluations 2310 Portfolio Presentation
17
Matchbox Design
Preference18 1304 AUDITIONS
POST Casting.
Distribute Matchbox Scripts to 2310
USITT19
20 1304 Meeting with Mr. Razavi in class for orientation and planning
Distribute Matchbox Scripts to 1304
21
22
23
24
Meet in Attic Theatre25 1304 Read-Thru in Class
Design and Crew Schedules Due
Prel. Prop Lists Due
Rehearsal A126
27 1304 Production Mtg w/ Assignments & Crew Schedules announced.
Scene Design Preliminary GP due
Chararcter Descriptions Due
Rehearsal A228 12:30 Matchbox Production Mtg.
29
30
31
Apr 1
Character Body Shapes Due
Costume Research FT due
Preliminary Props in rehearsal2
3 1304 Production Meeting
Final Scene Design Due
Costume Digital Photos of Actors
Lobby Ideas Presented
Rehearsal A44 12:30 Matchbox Production Mtg.
5
6
7
8 1304 Run Thru & Costume ideas are due
Sound Designs are due
FT Line Drawing of Characters w/Costumes
ALL LINES
TO BE MEMORIZED
Preliminary Poster Designs
Lobby Ideas Presented
Rehearsal A59
ALL LINES
TO BE MEMORIZED10 1304 Run Thru
Lighting Ideas Due for Plot Development
Scene Painting Roughs
Preliminary Costume Sketches
Final Property Designs
Rehearsal A611 12:30 Matchbox Production Mtg.
12 Hedda
13 Hedda
14
15 1304 Production Meeting
Program Info Due and to 2310
Technical Work Sessions
Set Levels, Set up Backstage, Costume Fittings, etc.
Program Info Due
Program Information Due
Costumes Due
2310 Costume Designerat Rehearsal A716
17 1304 OFF
Preliminary Program Copy
Rehearsal A818 GOOD FRIDAY
20 EASTER
21
Final Copy to Printer
Rehearsal B822 Tech 1304 Act I in class, Act II at Night.
Scene Design & Props Due23
24Hedda
Designs Completed
Painted Floor Due
Costumes Due
25 12:30 Matchbox Production Mtg.
26 Hedda
27
PUBLIC PRESENTATION28
PUBLIC PRESENTATION29 1304 Strike IN CLASS
HEDDA PAPER DUE
May 1
Course Evaluations
3 READING DAYS